6810 S.E. 31st
6810 S.E. 31st
We bought this home that was in an upper end neighborhood and demolished it. We were able to
confirm two 50 x 100 lots, and we built (2) new grand homes on the lot. We were in and out of this
project in about 12 months..
Before Construction
New Home 1
New Home 2